The Breeze – October 26, 1911 – Page 5

NEW POWER HOUSE BOILER
The new boiler at the power house is now ready for use, and in case of any difficulty with the old boiler plant, this is in reserve. Supt. Reeves tells us that the dynamo is not loaded to its full capacity and there are a number of houses on the waiting list (in DeFuniak Springs) wanting lights. It is going to be imperative to install additional light equipment before long.

 

Contributed by Michael Strickland

This entry was posted in 1911-10 October, General News, The Breeze and tagged , , , . Bookmark the permalink.